Southieinnc
Do Your Job!
Is this a repair or are you putting in a roll-in shower?Plumber came this morning with a Brute jackhammer.
Wife didn't want to be here for the noise so we went for a ride the long way to Daytona.
Came home at 1:30 and a 4 ft by 5 ft section of the bathroom floor filled 14 5 gallon buckets with concrete pieces.
He installed a new drain pipe and shower drain. The tile company will be here tomorrow with about 20 bags of concrete to put in the new floor and shower pan. Carpenter will be here Thursday to build two wall frames. Plumber will be back on Friday to install the new shower valve and the plumbing to the shower head. Next Monday the tile guys will be back to do the dryrock paneling and then Tuesday do the shower tiles and shower floor pieces. Hopefully, I'll have my shower back by next Wednesday. The tub and walls were demo'd last week but the plumber couldn't do his demo until today.
Now I really know why plumbers charge what they do. Jackhammer out the concrete to the dirt to build a new drain and haul all that crap out.
I helped him lift the buckets into his truck. I'm hoping for a discount.